New Jersey Department
of Environmental Protection
Office of Pollution Prevention and Right to Know
INSTRUCTIONS
NEW
FOR
POLLUTION PREVENTION PLANS COVERING THE FIVE YEAR
(Form DEP-113)
Inputs Nonproduct Output
Electronic
Reporting is Mandatory and Submission
is due by JULY
1 of the reporting year
Mandatory Online Pollution Prevention Plan Summary Submittal
New Jersey DEP requires the preparation
and submission of
the Pollution Prevention Plan Summary (P2 Plan Summary) using the DEP’s online portal. You can access and update previous year
information as well as create new reports, and you must submit your P2 Plan
Summary to the Department of Environmental
Protection (DEP) on the Internet. The facility must first complete the
Release and Pollution Prevention Report (RPPR) online. (In the “RPPR and P2 Plan Summary Folder” the status
must be “Awaiting Certification” or “Submitted.”)
Simply follow these steps: If you have completed the RPPR, you can skip
Part 1 and Part 2. Go to Part 3 to complete P2 Plan Summary submission.
1.
Go
to http://www.njdeponline.com and follow the link labeled “here” within
the following sentence: “New users should request access to DEP Online here (please see instructions).” This will open a new screen titled “Request
Access to DEP-Online.”
2.
Fill
in all fields.
3.
Click
on the “Request” button.
1.
You
will receive on-screen confirmation that your request is being processed.
2.
Click
on the “Continue” button.
3.
You
will receive an email from PortalComments@dep.state.nj.us containing a unique
Authorization Code as well as instructions for accessing DEP Online through
myNewJersey.
STEP 3: REGISTRATION
(Users who have NOT registered with
myNewJersey)
1.
Go
to http://www.nj.gov and click “Register.”
2.
Fill
in all fields.
3.
Click on “Create myNewJersey Account.” You are now registered with myNewJersey.
STEP 4: LOGGING IN & USING AUTHORIZATION
CODE
(Users who have registered with myNewJersey)
1.
Go
to http://www.nj.gov and click the “Login”
button.
2.
Enter
Log On ID and Password and click “Log On.”
3.
Click
on the “enter authorization code” link.
4.
Enter
your authorization code and click “Finished.”
The system will automatically log you out after clicking “Finished.”
1.
Log in to your account.
2.
Make
sure you are on the myNewJersey screen tab.
3.
Click
on “DEPOnline Services” under DEP Apps.
4.
Enter
your existing NJDEP Online account ID (your original User ID from NJDEP Online,
NOT your myNewJersey ID, if
different).
5.
Only
select the checkbox if you did not have a previous NJDEP Online account
OR you do not want to transfer your existing data and facilities, and
click “Continue.”
6.
Add
required Contact Information and click “Continue.”
7.
Request
your Certification PIN using the “Request PIN” button – you will receive this
via email from PortalComments@dep.state.nj.us. This PIN is required for Certification and
Submittal.
Note:
After completing these steps, you will be able to access NJDEP Online at
any time by visiting http://www.njdeponline.com
and clicking “Continue” at the top right of the screen.
NJDEP Online Instructions for the P2 Plan Summary: after you have logged onto
the myNewJersey Portal with your Authorization Code
Under the five tabs you will see:
“Version x.x
Currently Logged in:
Your Name (your User ID)”
You can find the instructions for the P2 Plan Summary under
the Documents and Forms tab.
1.
Under the “My Workspace” tab, scroll down to My
Facilities/Program Interests section and click on the “Add Facilities” button
on the right-hand side.
2.
A Facility Search screen will appear; fill in information
for CRTK Facility ID or Facility Name. Click
“Search” button at bottom right of page.
3.
Facility Search Results page will appear. Check the box for the facility(s) you would
like to access and click the “Add Selected Facilities” button.
4.
Add Facility(s) – you may have multiple facilities under
your account.
1.
Under the “My Workspace” tab, scroll down to Service
Selection and click on the “Configure Services” button on the right-hand side.
2.
Check boxes for desired services and click the “OK” button.
STEP 3: TO ACCESS YOUR FACILITY AND COMPLETE THE RPPR
1.
Under
Right to Know and Pollution Prevention Program in the Service Selection
section, click on “Release and Pollution Prevention Report and Pollution
Prevention Plan Summary.”
2.
The
Facility Selection screen will appear; highlight the facility of interest and
click on the “Access Facility” button under the selection list.
3.
This will bring you to the RPPR and P2 Plan Summary Folder
for the facility of interest.
4.
Click on the “Create New Report” button, enter the reporting
year, and select the radio button for the Release and Pollution Prevention
Report.
5.
In the RPPR and P2 Plan Summary Folder, click on the link
for the new Release and Pollution Prevention Report and you are on your way to
preparing the RPPR.
When you have completed the RPPR, the Status will be
“Awaiting Certification.” You will need
a certification PIN in order to certify and submit your RPPR. If you did not request one at registration,
from the RPPR & P2 Plan Summary Folder go to the dropdown list (found in
the upper left of the Folder screen) under “Identification” and select “Edit
User Profile.” At the DEPOnline Services
screen, be sure you are at the User Profile tab and click on the “Request Cert
Pin” link. In a matter of minutes you
should receive a certification PIN by email from PortalComments@dep.state.nj.us. Go back to your Folder by clicking on the “My
Workspace” tab, click on “Release and Pollution Prevention Report and
Pollution Prevention Plan Summary” and access your facility’s Folder. Click on the “Certification and Submittal”
button and check the appropriate certification box(es) and certify with
appropriate information. A complete
submission will result in a screen with the following message: “The Report
certification was successful.” Print two
(2) copies of the RPPR; one for the facility and one to be sent to your
Part 3. The facility must first complete the Release and Pollution Prevention
Report (RPPR) online. (In the “RPPR and
P2 Plan Summary Folder” the status must be “Awaiting Certification” or
“Submitted.”)
STEP 1: TO ACCESS YOUR FACILITY AND COMPLETE THE P2
PLAN SUMMARY
1.
In the “RPPR and P2 Plan Summary Folder”, click on the “Create
New Report” button, enter the reporting year, and select the radio button
for the “Pollution Prevention Plan
Summary(DEP113 From)” and click the “Continue” button.
2.
Complete the P2 Plan Summary; then certify
and submit it to the DEP online!
When you have
completed the P2 Plan Summary, the Status will be “Awaiting
Certification.” Use same certification
PIN to certify and submit your P2 Plan Summary.
REMEMBER to print and sign a copy for your records and keep it at your
site. For additional information or
assistance in completing the eRPPR/ P2 Plan Summary, please call (609) 777-0518 during business hours (8:00 a.m. – 5:00 p.m.)
NEW
FOR POLLUTION PREVENTION
PLANS COVERING THE FIVE YEAR
(Form DEP-113)
TABLE OF
CONTENTS
I. GENERAL
INFORMATION
WHAT FACILITIES ARE COVERED?
...............................……....….................1
WHAT ARE COVERED FACILITIES REQUIRED TO DO?
....….........…...…............1
WHAT HAZARDOUS SUBSTANCES ARE COVERED?..............…...…...............2
WHAT INFORMATION IS CONTAINED IN THE P2
PLAN SUMMARY? ...........2
II. SECTION-SPECIFIC INSTRUCTIONS
SECTION A.
GENERAL FACILITY INFORMATION ...........…......……….............
2
SECTION B. FACILITY-LEVEL
INFORMATION.....................….......………............4
SECTION C. PROCESS DESCRIPTION
...............................….......…………........... 5
SECTION
D. TARGETED PROCESS INFORMATION .....………..................... 6
III.
HOW TO SUBMIT THE P2 PLAN SUMMARY ...................….................… 7
APPENDIX 1
POLLUTION PREVENTION METHODS
..................…….... 9
APPENDIX 2
PROCESS TECHNIQUES
...............….................…..........10
APPENDIX
3 WASTE TREATMENT METHODS ............….................…..........12
INSTRUCTIONS FOR THE
NJDEP
POLLUTION PREVENTION PLAN SUMMARY
FOR POLLUTION PREVENTION PLANS COVERING THE
FIVE YEAR
(Form
DEP-113)
FOR QUESTIONS REGARDING THE P2 PLAN SUMMARY,
CALL THE NJDEP OFFICE OF POLLUTION PREVENTION & RIGHT TO
KNOW AT:
(609)
777-0518
--------------------------------------------------------------------------------------------------------------------------------
WHAT FACILITIES ARE
COVERED?
Any industrial facility in New Jersey required to submit at least one Toxic Release Inventory (TRI) report to the United States Environmental Protection Agency (USEPA) under Section 313 of the federal Emergency Planning and Community Right to Know Act of 1986 (EPCRA) and a Release and Pollution Prevention Report (RPPR) under the New Jersey Worker and Community Right to Know Act for the same chemical in two consecutive years is covered under the New Jersey Pollution Prevention Act and regulations as long as the reported chemical remains at or above TRI activity thresholds.
Covered
facilities must prepare a five-year Pollution Prevention (P2) Plan and submit a
P2 Plan Summary by July 1 once they
become covered (the second year they
submit an RPPR for the same chemical).. The full P2 Plan is not required to
be submitted to the New Jersey Department of Environmental Protection (NJDEP). The P2 Plan remains on site at the facility
and is subject to inspection by NJDEP.
In the years following the preparation of the Plan and Plan Summary, an
RPPR containing a P2 Progress Report (the P2 115 or Sections C and D) must be
submitted by July 1.
NOTE: If the facility is not required to submit a TRI report, but has submitted a TRI report or an RPPR in the past, NJDEP should be notified of the facility’s present status. It is mandatory for the facility to provide to the Department at the address below a statement explaining why the facility is no longer covered by the TRI reporting requirements.
MAIL CODE
22-03C
New
Jersey Department of Environmental Protection
Division
of Environmental Safety and Health
Office of
Pollution Prevention and Right To Know
WHAT ARE COVERED
FACILITIES REQUIRED TO DO?
Facilities
covered under the New Jersey Pollution Prevention Act are required to prepare
three documents in accordance with N.J.A.C.7:1K et seq. The first is a comprehensive P2 Plan that remains onsite at the
facility. The second requirement is completion and electronic submission of the
P2 Plan Summary (DEP-113). The P2 Plan Summary is, as its name
indicates, a summary of the facility’s P2
Plan. Both the P2 Plan Summary and the full P2
Plan must be completely revised every five years.
In addition to the five-year P2 Plan Summary, beginning with the year following the completion of the P2 Plan and Plan Summary, the third document that facilities are required to prepare is an annual P2 Progress Report. This requirement is satisfied by the annual submission of the RPPR, which includes the P2 Progress Report.
PLEASE NOTE THAT THE DEPARTMENT PERFORMS
ROUTINE INSPECTIONS TO VERIFY THAT COMPLETE AND ACCURATE P2 PLANS ARE BEING
MAINTAINED ON SITE. IN ADDITION TO THE
P2 PLAN, THE P2 PLAN SUMMARY IS A SEPARATE DOCUMENT THAT MUST BE SUBMITTED
ELECTRONICALLY TO THE NJDEP.
WHAT HAZARDOUS
SUBSTANCES ARE COVERED?
The
list of hazardous substances reportable on the P2 Plan Summary is the same list
as the Section 313 Toxic Chemical List that applies to the federal TRI. For electronic reporting, the system
automatically limits the substances to those reported on the RPPR. If the
facility manufactured, processed and/or otherwise used any of these hazardous
substances in quantities of 10,000 pounds or more (with all applicable
exemptions) during the base year, or above listed threshold quantities for
persistent bioaccumulative toxic (PBT) chemicals, the facility must include
them in the P2 Plan and on the P2 Plan
Summary. The substance list can also be
found at http://www.state.nj.us/dep/opppc/figdoc.htm
Pursuant
to N.J.A.C. 7:1K-3.1(h), if the sum of nonproduct output and quantity shipped
as (or in) product for that hazardous
substance does not exceed 500 pounds, determined from the value reported in
Section B of the most current RPPR, the substance shall be exempt from P2
Planning requirements. The substance
does not need to be included in the P2 Plan.
In addition, that substance does not need to be reported on the P2 Plan
Summary or the subsequent annual Progress Reports, RPPR, section C and D or
P2-115.
WHAT INFORMATION IS
CONTAINED IN THE P2 PLAN SUMMARY?
The P2 Plan Summary is based on information contained in the facility’s P2 Plan. Completing the P2 Plan Summary entails transferring information directly from the P2 Plan to the P2 Plan Summary. There are four sections to the P2 Plan Summary:
Section A asks for general facility
information.
Section B asks for information on the
facility’s five-year reduction goals for each covered hazardous substance at
the facility.
Section C asks for information on each
production process that uses covered hazardous substances or generates
hazardous substances as nonproduct output (NPO). Complete one section for EACH covered
production process or grouped process.
Section D asks for information on the
facility’s five-year reduction goals for those processes or grouped processes
identified in Section C that are targeted in the P2 Plan. Complete one Section D for EACH targeted
process or targeted grouped process.
SECTION A. FACILITY-LEVEL ADMINISTRATIVE INFORMATION
New, Modification and Renewal Boxes: If this P2 Plan Summary is the first
one ever to be submitted to the Department, check the “New” box. If this P2 Plan Summary reflects a
modification to the facility’s P2 Plan during a five-year cycle, check the “Modification”
box. If this P2 Plan Summary is to be
submitted for a subsequent five-year planning cycle, check the “Renewal” box.
See “Frequently Asked Questions” on the Web at http://www.nj.gov/dep/opppc/faq.pdf to determine if modification is necessary.
1. Telephone and FAX Numbers: Enter the facility’s telephone number and FAX number
without punctuation.
2. Highest Ranking Corporate Official at Facility: Enter the name and the position or title
of the highest-ranking corporate official at this facility.
3. R&D and Pilot Plant Exemption: If
this facility has an approved NJ RTK Research & Development (R&D)Laboratory
exemption pursuant to N.J.A.C. 7:1G, it will be pre-populated here. If an exemption applies but the number does
not show up here, call the Office at (609) 777-0518.
4.a. Total Number of Processes: Enter the
total number of processes that involve hazardous substances at the
facility. These processes are the ones
identified in the facility’s P2 Plan.
This number must equal the number of Section Cs in this P2 Plan Summary.
4.b. Number of Targeted Processes: Facilities may target a subset of their total production
processes. Facilities that do not target a subset of processes must target all
of their processes. One Section D is
required for each targeted process. The
criterion that a facility must use for targeting is that the number of targeted
processes must equal at least 90% of the total amount of hazardous substances
used or generated as nonproduct output or released at the
facility. Enter the number of processes
or grouped processes that the facility has targeted. Be aware that all
processes with PBTs above the reporting threshold(s) must be targeted.
4.c. Basis for Targeting: Enter
the code “U,” “N,” “R,” or “A” to indicate whether the facility chooses to
target production processes that equal at least 90% of the total USE (U),
generation of nonproduct output (N) or total environmental releases (R) of all
hazardous substances at the facility. If
a facility chooses to target all production processes, select (A) in the box.
5.
Confidential Information: Select “Yes” if the P2 Plan Summary
contains information that the facility claims is confidential and “No” if it is
not. If the facility selects “Yes,” the
facility should continue completing and submitting the P2 Plan Summary online
by leaving the confidential information blank on the rest of the forms. This
will become a public version of P2 Plan Summary of the facility.
After submitting the public version online, the facility should print out a copy of the P2 Plan Summary and complete all the confidential information with RED ink. Pursuant to the N.J.A.C. 7:1K-1 et seq., the facility should follow the following steps in order to complete the confidential submittal: 1) every page of the confidential version should be clearly marked "CONFIDENTIAL" except for the first page which should be marked "CONFIDENTIAL COPY"; and 2) the confidential version should be placed in a sealed envelope marked "CONFIDENTIAL" on both sides with facility name and ID number marked as well, enclosed in a second envelope for mailing which shall bear no markings indicating confidentiality, and submitted to NJDEP, Office of Pollution Prevention and Right to Know, Station Plaza 4, 22 S. Clinton Avenue-3rd Floor, P.O. Box 443, Trenton, NJ 08625-0443
6.
Union Representative at Facility (if
applicable): Enter the
name of the union representative, Union
and Local #, and business phone number
at this facility
SECTION B. FACILITY-LEVEL INFORMATION
Complete Section B data for each covered hazardous substance at the facility. These substances must be the same as those reported on the RPPR.
1.
& 2. CAS number or Category number and
Hazardous Substance: Click the “Add Substance” button and select all
the substances listed. The covered
substance name and CAS number will be automatically populated.
3 Five-Year Facility-Level NPO and USE Reduction Goals:
To complete this section, refer to the facility’s P2 Plan, which must
include a section on the facility's goals for reducing USE and Nonproduct
Output (NPO). The facility’s P2 Plan should have
produced reduction goals for both the USE and NPO of hazardous
substances due to pollution prevention techniques. Record the facility-level goals here for each
hazardous substance.
3.a. Five-Year Use Reduction Goal (pounds): Enter
the five-year USE reduction goal in pounds for this substance from the
facility’s P2 Plan. This should be the difference in pounds in the amount of
the substance the facility used in the base year and the amount the facility
expects to use at the end of the planning cycle (the fifth year). State the facility’s reduction goal assuming
constant production, that is, assuming that the facility will be producing the
same quantity of product in five years as was produced in the base year. These goals should reflect planned reductions
due to pollution prevention measures only. The goals should not include reductions
resulting from discontinued operations or operations sent to another facility,
as these measures do not qualify as pollution prevention under the statutory
definition. The facility may have zero
reduction goals.
3.b. Five-Year NPO Reduction Goal (pounds): Enter the five-year NPO reduction goal in
pounds for this substance from the facility’s P2 Plan. This should be the
difference in pounds between the amount of the substance the facility generated
as NPO in the base year and the amount of NPO the facility expects to generate
at the end of the planning cycle (the fifth year). State the facility’s reduction goal
assuming constant production, that is, assuming that the facility will be
producing the same quantity of product in five years as was produced in the
base year. These goals should reflect
planned reductions due to pollution prevention measures only. The goals should not include reductions
resulting from discontinued operations or operations sent to another facility,
as these measures do not qualify as pollution prevention under the statutory
definition. The facility may have zero
reduction goals.
3.c. Five-Year Use Reduction Goal (percent):
Enter the percentage of the base year USE that the facility plans to cut by the
goal year. Find the five-year USE
reduction percent goal by doing the following calculation:
Five-year USE reduction goal (pounds) x 100 = Five-Year USE % Reduction Goal
Base year USE (pounds)
3.d. Five Year NPO Reduction Goal (percent): Enter
the percentage of the base year NPO that the facility plans to cut by the goal
year. Find the five year NPO reduction
percent goal by doing the following calculation:
Five year NPO reduction goal (pounds) x 100 = Five Year NPO % Reduction Goal
Base Year NPO (pounds)
SECTION C. PROCESS DESCRIPTION
Complete one Section C for each
process or grouped process that USES, generates as NPO, or RELEASES a covered
hazardous substance. The number of these sections the facility
submits must equal the number the facility entered in Question 4.a. of Section A.
At the “Sections C &
D: Pollution Prevention Processes Folder”
Process ID: Enter the identifier, defined in the
facility’s P2 Plan, to be used to refer to the process described in this
Section throughout the facility’s P2 reporting.
The same identifier must be used in the facility’s P2 Plan, P2 Plan
Summary, and RPPR. The identifier must
be unique, applying to only one process (or grouped process). The identifier may be up to 12 characters
long and may consist of letters, numerals, or both. Do not use punctuation or spaces in your process ID.
Targeted
Processes: Indicate
"Yes" if this process was targeted in the facility’s Pollution
Prevention Plan, otherwise indicate "No.”
Remember that a facility must target any combination of processes or
sources that contribute to at least 90% of the facility’s USE, NPO or releases
and must include all processes with PBTs. Otherwise, all processes must be
targeted.
1.
Process ID: This element is
pre-populated, if this is your “Renewal” or “Modification”. Otherwise, enter
the identifier, defined by the facility in their P2 Plan, to be used to refer
to the process described in this Section throughout the facility’s pollution
prevention reporting. The same identifier must be used in the facility’s P2
Plan, P2 Plan Summary, and P2 Progress Report (RPPR Section D or P2-115). The identifier must be unique,
applying to only one process (or grouped process). The identifier may be up to
12 characters long and may consist of letters, numerals, or both. Do
not use punctuation or spaces in your Process ID.
2.a. Process Category: Indicate whether this process or grouped
process (1) manufactures a chemical, (2) manufactures an article,
(3) stores and/or handles hazardous substances, or (4) treats and/or
recycles (out-of-process) NPO. Complete
the box for the category that best fits the process or grouped process. The storage and handling process category
should be chosen when the process or grouped process is solely storage
and handling. Descriptions of these
categories are as follows.
Article
manufacturing usually
produces discrete items with an identity that is not encompassed by a specific
chemical name. Chemicals used in article
manufacturing are seldom consumed; they may be mixed and combined into an
article, or used in some way in the production of the article, such as in a
solvent cleaner or degreasing step.
Chemical
manufacturing usually
combines chemical ingredients to produce a chemical product. If this process
consumes (molecularly alters) a chemical, then it is almost always a chemical
manufacturing process.
Storage
and Handling processes
generally involve storing raw materials prior to use, storing materials
recycled on-site prior to use, storing wastes prior to disposal, storing final
product or handling hazardous substances through transfers from one area of the
facility to another. If there is a
storage and handling component of the process, choose the category that fits
the parent process rather than "storage and handling."
Treatment
Operations involve the
treatment or recycling of hazardous substances that leave a process as
NPO. These operations must be identified
when they use hazardous substances as part of the treatment or recycling
process. Treatment and recycling processes may not be grouped together with or
as part of other processes.
2.b. Mode of Operation: Indicate one mode of operation that best
describes how this process is run, either batch or continuous. For Treatment/Recycling and Storage/Handling
processes, select “Not Applicable.”
Descriptions
of the two modes of operation follow:
A batch
process will have an identifiable beginning and end over a relatively short
time frame. It will entail inputting a
set amount of raw materials at the beginning and perhaps during the process to
produce a set amount of product at the end.
Examples include the formulation of a set quantity of a certain color
pigment or a run of a particular pattern of wall covering.
A continuous
process involves a continuous flow of raw material inputs to produce a
continuous flow of outputs. An example
is the production of gasoline and other fuels from crude oil.
2.c. Specific Descriptions: For each step in the process or grouped
process, select the code corresponding to the most applicable descriptor. (See
Appendix 2.) For instance, a process
that makes adhesive tape might involve three steps: mixing an adhesive resin
with a solvent, applying this mixture to paper backing, and driving the solvent
from the tape with a dryer. The
appropriate process descriptors would be UC1, "Mixing"; AA6,
"Coating -- adhesive application"; and UA9, "Drying."
The
descriptor list includes "similar to" and "other"
categories. Use these only if another
descriptor is inadequate to identify the process step. Augment the facility’s description if
necessary in the space provided, that generically describes the step, perhaps
by indicating a term not found on the list that would suffice. Select a descriptor for each discrete step
until the entire process is described.
2.d. Hazardous substances used or generated by
this process: Select
each covered hazardous substance used or generated by this process.
3.
Targeted Processes: This element is pre-populated, if this is
your “Renewal” or “Modification”. Otherwise, indicate “Y” for “Yes” if this
process was targeted in the facility’s P2 Plan, or indicate “N” for “No.”
Remember that a facility must target any combination of processes or sources
that contribute to at least 90% of the facility’s USE, NPO or Releases and must
include all PBTs. If not, all processes must be targeted.
4.
Grouped Processes: In the P2 Plan, the facility could have
associated several processes together into a single grouped process that would
be treated as a single process for the purposes of pollution prevention
planning. Select "Yes" if this
process is a grouped process; otherwise select "No."
SECTION D. TARGETED PROCESS INFORMATION
Complete
one of these sections for each targeted production process the facility has
identified in the P2 Plan. This section summarizes 5-year USE and NPO
reduction goals for each hazardous substance used in the process. Instructions for specific questions
follow. The number of these sections
that the facility submits must equal the number the facility entered in
Question 4.b. of Section A.
1. Five-Year Reduction Goals for Hazardous
Substances used in Process or Grouped Process
Five-Year Reduction Goal per Unit of
Product Percent: Enter the process-level reduction per unit of
product goals for each hazardous substance used or generated as NPO by this
targeted process, as a percentage reduction from the base year. Include reduction goals for both USE per unit
of product and NPO per unit of product.
EXAMPLE: A process that
produces metal tools presently generates 100 pounds of solvent as NPO per 1000
items. The facility’s P2 Plan goal for
this process is 10 pounds NPO per 1000 items; therefore the facility’s NPO per
unit of product goal is to move from 100/1000 (0.1) to 10/1000 (0.01). The reduction sought is a reduction from 100
pounds to 10 pounds per 1000 items, hence [(100-10)/100]*100=90%. This is an NPO reduction goal of 90%.
Estimated Date of Introduction and
Completion: For each
technique or group of techniques associated with a specific hazardous
substance, enter the estimated date when work on any of the techniques will
begin and the estimated date when any of the techniques will be completed. This
summarizes the facility’s implementation schedule. If a technique was begun prior to the base
year and implementation continues, state the date when the technique was begun.
Description
of Pollution Prevention Techniques:
For each substance, select the code(s) that describes the pollution prevention
technique(s) the facility plans to use to reduce USE or the generation of NPO
over the next five years. (See Appendix 1.)
If none of the codes adequately describes the pollution prevention
technique(s) the facility has chosen, enter the description in the box.
2.
(Optional) Raw Material Substitution Certification:
(Complete only if the facility wants to establish that raw material
substitution is not feasible.) There are
many pollution prevention techniques; raw material substitution is only one of
them. The Pollution Prevention Act
recognizes that there are situations in which a specific hazardous substance is
the only raw material that will produce a desired product. Therefore, facilities may publicly establish,
through a raw material substitution certification, that there is no way to
reduce the USE and/or NPO of a specific substance in a specific process through
substitution of a non-hazardous substance. This does not, however, excuse the
facility from looking for pollution prevention opportunities that do not
involve raw material substitution. Facilities self-certify their own raw
material substitution certification on the basis of a completed P2 Plan.
To self-certify the raw material
substitution certification in the P2 Plan Summary, a facility must:
2.a. Identify the hazardous substance(s) for
which the certification is being made.
Enter the name of one or more hazardous substances (from Question 1 of
this section).
2.b.
Explain why raw material substitution cannot be accomplished for the
hazardous substance(s). Enter a brief
narrative explanation. For instance,
"This process makes PVC pipe. The
hazardous substance vinyl chloride is an essential component of PVC."
III.
How to submit
the P2 Plan Summary
DEP regulations now require electronic submission of the
P2 Plan Summary. For electronic certification and submittal, the person who is
the responsible party must have his/her own User Profile set up (see page I), with
his/her own name under User Name. This will be the name that prints out for the
certification. The certifier should select a PIN that is easy to remember, but
that is known only to him or her.
When the P2 Plan Summary has been completed and is ready
for certification and submittal, the certifying official must access the
facility report by logging in with his/her own User ID and PIN, selecting the
“Release and Pollution Prevention Report and Pollution Prevention Plan Summary”
radio button, clicking the “Continue” button, and clicking the “Access
Facility” button.
Once the facility report screen has been accessed, the
certifying official will see that the Report Status is “Awaiting
Certification.” (If the Status is NOT “Awaiting Certification,” contact the
Office at the phone number below for assistance.) Click the “Certification and
Submittal” button to get to the certification folder and select the report to
be certified and click “Continue.”
Check the appropriate boxes for the certifying
statements, enter the PIN and Title of the certifier. (Note: the name of the
certifying party will show up on this screen as the User ID, but will show up
on the certification signature as the User Name.) Click on the “Certify” button
and a screen will appear stating that “The Report certification was
successful.” Click “Continue” to get to the RPPR and P2 Plan Summary Folder.
The Status will now be “Submitted.”
Use the printer icon to the left of the Report to format
the report for printing.
In the case of a confidential paper submission, (see
page 3 for details), it is required to return the completed original P2 Plan
Summary to the DEP at the address below.
MAIL CODE
22-03C
New
Jersey Department of Environmental Protection
Division
of Environmental Safety and Health
Office of
Pollution Prevention and Right To Know
For additional assistance or any questions about
completing the P2 Plan Summary, contact the DEP's Office of Pollution
Prevention and Right to Know at (609) 777-0518.
Appendix 1
POLLUTION PREVENTION METHODS
(Adapted from EPA TRI Instructions)
Use for Section D, question 1.
Good
Operating Practices
W13 Improved maintenance scheduling, record
keeping, or procedures
W14 Changed production schedule to minimize
equipment and feedstock changeovers
W19 Other changes in operating practices
Inventory
Control
W21 Instituted procedures to ensure that
materials do not stay in inventory beyond shelf life
W22 Began to test outdated material -
continue to use if still effective
W23 Eliminated shelf-life requirements for
stable materials
W24 Instituted better labeling procedures
W25 Instituted clearinghouse to exchange
materials that would otherwise be discarded
W29 Other changes in inventory control
Spill
and Leak Prevention
W31 Improved storage or stacking procedures
W32 Improved procedures for loading,
unloading, and transfer operations
W33 Installed overflow alarms or automatic
shutoff valves
W35 Installed vapor recovery systems
W36 Implemented inspection or monitoring
program of potential spill or leak sources
W39 Other spill and leak prevention
Raw
Material Modifications
W41 Increased purity of raw materials
W42 Substituted raw materials not on the TRI
list
W49 Other raw material modifications
Process
Modifications
W51 Instituted recirculation within a process
W52 Modified equipment, layout, or piping
W53 Use of a different process catalyst
W54 Instituted better controls on operating
bulk containers to minimize discarding of empty containers
W55 Changed from small volume containers to
bulk containers to minimize discarding of empty containers
W58 Other process modifications
Cleaning
and Degreasing
W59 Modified
stripping/cleaning equipment
W60 Changed
to mechanical stripping/cleaning devices (from solvents or other materials)
W61 Changed
to aqueous cleaners (from solvents or other materials)
W63 Modified
containment procedures for cleaning units
W64 Improved
drainage procedures
W65 Redesigned
parts racks to reduce dragout
W66 Modified
or installed rinse systems
W67 Improved
rinse equipment design
W68 Improved
rinse equipment operation
W71 Other
cleaning and degreasing modifications
Surface
Preparation and Finishing
W72 Modified
spray systems or equipment
W73 Substituted
coating materials used
W74 Improved
application techniques
W75 Changed
from spray to other system
W78 Other
surface preparation and finishing modifications
Product
Modifications
W81 Changed
product specifications
W82 Modified
design or composition
W83 Modified
packaging
W89 Other
product modifications
On-Site
Recycling Processes
NOTE:
On-Site Recycling is considered pollution prevention ONLY IF IN-PROCESS (See
N.J.A.C. 7:1K-1.5).
R11 Solvents/organic
recovery - batch still distillation
R12 Solvents/organic
recovery - thin-film evaporation
R13 Solvents/organic
recovery - fractionation
R14 Solvents/organic
recovery - solvent extraction
R19 Solvents/organic
recovery - other
R21 Metals
recovery - electrolytic
R22 Metals
recovery - ion exchange
R23 Metals
recovery - acid leaching
R24 Metals
recovery - reverse osmosis
R26 Metals
recovery - solvent extraction
R27 Metals
recovery - high temperature
R28 Metals
recovery - retorting
R29 Metals
recovery - secondary smelting
R30 Metals
recovery - other
R40 Acid
regeneration
R99 Other
reuse or recovery
Appendix 2
(Use for Section C, question 3.c.)
A
List: Most Applicable to Article
Manufacturing
Processes
AA1 Bleaching
AA2 Cleaning - of metal
AA3 Cleaning - paint stripping
AA4 Cleaning - of equipment
AA5 Cleaning - other
AA6 Coating - adhesive application
AA7 Coating - paint application
AA8 Coating - other
AA9 Degreasing
AB1 Dyeing
AB2 Electroless plating
AB3 Electroplating
AB4 Etching
AB5 Metal casting/machining
AB6 Metal treatment (other than plating)
AB7 Painting
AB8 Paper manufacturing/treatment
AB9 Photographic film manufacturing or
processing
AC1 Plastics molding/casting/extrusion
AC2 Printing
AC3 Soldering/welding
AC4 Stripping
AC5 Tanning
AC6 Wood pulping/treatment
AC7 Similar to
AC8 Other article manufacturing
C
List: Most Applicable to Chemical
Manufacturing
CP1 Purification
CP2 Separation
CP3 Formulation/blending
CP4 Chemical synthesis
CP5 Chemical breakdown
CP6 Chemical conversion
CP7 Similar to
CP8 Other chemical manufacturing
H
List: Most Applicable to Storage and
Handling
HA1 Above ground tank
HA2 Below ground tank (steel)
HA3 Below ground tank (fiberglass)
HA4 Tank inside building
HA5 Steel drum
HA6 Plastic drum
HA7 Fiber drum
HA8 Can
HA9 Carboy
HB1 Silo
HB2 Bag
HB3 Box
HB4 Cylinder
HB5 Bottles or jugs (glass)
HB6 Bottles or jugs (plastic)
HB7 Tote bin
HB8 Tank wagon
HB9 Rail car
HC1 Other storage and handling
T
List: Use to Supply Additional
Information
if Necessary on Chemical
Reactions
TA1 No reaction
TA2 Acylation
TA3 Alkylation
TA4 Amination
TA5 Ammonolysis
TA6 Aromatization
TA7 Calcination
TA8 Carboxylation
TA9 Combustion
TB1 Condensation
TB2 Dehydration
TB3 Dehydrogenation
TB4 Desulfurization
TB5 Diazotination and coupling
TB6 Double decomposition
TB7 Electrolysis
TB8 Esterification
TB9 Fermentation
TC1 Friedel-Crafts
TC2 Halogenation
TC3 Hydroformylation
TC4 Hydrogenation
TC5 Hydrolysis
TC6 Ion exchange
TC7 Isomerization
TC8 Neutralization
TC9 Nitration
TD1 Oxidation
TD2 Polymerization
TD3 Pyrolysis/cracking
TD4 Reduction
TD5 Silicate formation
TD6 Sulfonation
TD7 Other reaction
U
List: Most Applicable for Describing
Unit
Operations
for Any Process Category
UA1 Absorption/adsorption
UA2 Centrifugation
UA3 Cleaning/degreasing
UA4 Condensation
UA5 Crystalization
UA6 Desalting
UA7 Disintegration
UA8 Distillation
UA9 Drying
UB1 Dust collection
UB2 Evaporation
UB3 Fermentation
UB4 Filtration
UB5 Grinding/milling
UB6 Heat exchange
UB7 Humidification
UB8 Ion exchange
UB9 Melting
UC1 Mixing
UC2 Packaging
UC3 Pressurizing
UC4 Reaction
UC5 Screening
UC6 Scrubbing
UC7 Sedimentation
UC8 Separation
UC9 Settling
UD1 Soaking/wetting
UD2 Solvent extraction
UD3 Spraying/coating
UD4 Stripping
UD5 Other unit operation
E
List: Use to Supply Additional
Information Regarding Equipment for Any Process Category
EA1 Absorption bed
EA2 Aerator
EA3 Blower
EA4 Boiler
EA5 Centrifuge
EA6 Compressor
EA7 Condenser
EA8 Cooler
EA9 Crystalizer
EB1 Digester
EB2 Distillation Column
EB3 Dryer
EB4 Evaporator
EB5 Scrubber/stripper/extraction tower
EB6 Extruder
EB7 Filter
EB8 Flash drum
EB9 Fractioning tower
EC1 Furnace
EC2 Heat exchanger
EC3 Holding tank
EC4 Mill/grinder
EC5 Mixer
EC6 Reactor vessel
EC7 Refrigeration unit
EC8 Rinse tank
EC9 Separator
ED1 Settling tank
ED2 Other equipment
P
List: Use to Supply Additional
Information Regarding Phase Form for Any Process Category
PA1 Gas
PA2 Liquid (coherent)
PA3 Solid
PA4 Aqueous solution
PA5 Organic solution
PA6 Slurry
PA7 Sludge
PA8 Emulsion
PA9 Powder fines
PB1 Aqueous acid
PB2 Aqueous base
PB3 Metal product
PB4 Polymer mixer
PB5 Crude petroleum
PB6 Refined fuel/mixed hydrocarbon
PB7 Unrefined ore/minerals
PB8 Clay/cement
PB9 Animal byproducts
PC1 Vegetable byproducts
PC2 Wood chips/pulp/byproducts
PC3 Other phase form
WASTE
TREATMENT METHODS (Use for Section C, question
3.c., ONLY IF Treatment Operations is selected for question 3.a.)
Air
Emissions Treatment
A01 Flare
A02 Condenser
A03 Scrubber
A04 Absorber
A05 Electrostatic Precipitator
A06 Mechanical Separation
A07 Other Air Emission Treatment
Biological
Treatment
B11 Biological Treatment - aerobic
B21 Biological Treatment - anaerobic
B31 Biological Treatment - facultative
B99 Biological Treatment - other
Chemical
Treatment
C01 Chemical Precipitation - lime or
sodium
hydroxide
C02 Chemical Precipitation - sulfide
C09 Chemical Precipitation - other
C11 Neutralization
C21 Chromium Reduction
C31 Complexed Metals Treatment (other than
pH adjustment)
C41 Cyanide Oxidation - alkaline
chlorination
C42 Cyanide Oxidation - Electrochemical
C43 Cyanide Oxidation - other
C44 General Oxidation (including
disinfection) - chlorination
C45 General Oxidation (including
disinfection) - ozonation
C46 General Oxidation (including
disinfection) - other
C99 Other Chemical Treatment
Incineration/Thermal
Treatment
F01 Liquid Injection
F11 Rotary Kiln with Liquid Injection Unit
F19 Other Rotary Kiln
F31 Two Stage
F41 Fixed Hearth
F42 Multiple Hearth
F51 Fluidized Bed
F61 Infra-Red
F71 Fume/Vapor
F81 Pyrolytic Destructor
F82 Wet Air Oxidation
F83 Thermal Drying/Dewatering
F99 Other Incineration/Thermal Treatment
Physical
Treatment
P01 Equalization
P09 Other Blending
P11 Settling/Clarification
P12 Filtration
P13 Sludge Dewatering (non-thermal)
P14 Air Flotation
P15 Oil Skimming
P16 Emulsion Breaking - thermal
P17 Emulsion Breaking - chemical
P18 Emulsion Breaking - other
P19 Other Liquid Phase Separation
P22 Adsorption - ion exchange (other than
for recovery/reuse)
P23 Adsorption - resin
P29 Adsorption - other
P31 Reverse Osmosis (other than for
recovery/reuse)
P41 Stripping - air
P42 Stripping - steam
P49 Stripping – other
P51 Acid Leaching (other than for
recovery/reuse)
P61 Solvent Extraction (other than
recovery/reuse)
P99 Other Physical Treatment
Solidification/Stabilization
G01 Cement Processes (including Silicates)
G09 Other Pozzolonic Processes (including
Silicates)
G11 Asphaltic Processes
G21 Thermoplastic Techniques
G99 Other Solidification Process