New Jersey Department of Environmental Protection

Office of Pollution Prevention and Right to Know

www.state.nj.us/dep/opppc/

 
 

 

 

 

 

 


INSTRUCTIONS

 

NEW JERSEY POLLUTION PREVENTION PLAN SUMMARY

FOR POLLUTION PREVENTION PLANS COVERING THE FIVE YEAR

(Form DEP-113)

 

 

 

Inputs

 

Nonproduct

Output

 
 

 

 

 

 

 

 

 

 

 

 

 

Electronic Reporting is Mandatory

and

Submission is due by

JULY 1 of the reporting year

 
 

 

 

 

 

 

 

 

 

 


Mandatory Online Pollution Prevention Plan Summary Submittal

 

New Jersey DEP requires the preparation and submission of the Pollution Prevention Plan Summary (P2 Plan Summary)  using the DEP’s online portal.  You can access and update previous year information as well as create new reports, and you must submit your P2 Plan Summary to the Department of Environmental Protection (DEP) on the Internet.  The facility must first complete the Release and Pollution Prevention Report (RPPR) online. (In the “RPPR and P2 Plan Summary Folder” the status must be “Awaiting Certification” or “Submitted.”)

 

Simply follow these steps:  If you have completed the RPPR, you can skip Part 1 and Part 2. Go to Part 3 to complete P2 Plan Summary submission.

 

Part 1.

 

STEP 1: REQUESTING ACCESS

(New Users – Users who do not have a NJDEP Online account)

1.      Go to http://www.njdeponline.com and follow the link labeled “here” within the following sentence: “New users should request access to DEP Online here (please see instructions).  This will open a new screen titled “Request Access to DEP-Online.”

2.      Fill in all fields.

3.      Click on the “Request” button.

 

STEP 2: ACCESS CONFIRMATION

1.        You will receive on-screen confirmation that your request is being processed.

2.        Click on the “Continue” button.

3.        You will receive an email from PortalComments@dep.state.nj.us containing a unique Authorization Code as well as instructions for accessing DEP Online through myNewJersey.

 

STEP 3: REGISTRATION

(Users who have NOT registered with myNewJersey)

1.        Go to http://www.nj.gov and click “Register.”

2.        Fill in all fields.

3.       Click on “Create myNewJersey Account.”  You are now registered with myNewJersey.

 

STEP 4: LOGGING IN & USING AUTHORIZATION CODE

(Users who have registered with myNewJersey)

1.          Go to http://www.nj.gov and click the “Login” button.

2.          Enter Log On ID and Password and click “Log On.”

3.          Click on the “enter authorization code” link.

4.          Enter your authorization code and click “Finished.”  The system will automatically log you out after clicking “Finished.”

 

STEP 5: FINISHING UP

1.         Log in to your account.

2.          Make sure you are on the myNewJersey screen tab.

3.          Click on “DEPOnline Services” under DEP Apps.

4.          Enter your existing NJDEP Online account ID (your original User ID from NJDEP Online, NOT your myNewJersey ID, if different).

5.          Only select the checkbox if you did not have a previous NJDEP Online account OR you do not want to transfer your existing data and facilities, and click “Continue.”

6.          Add required Contact Information and click “Continue.”

7.          Request your Certification PIN using the “Request PIN” button – you will receive this via email from PortalComments@dep.state.nj.us.  This PIN is required for Certification and Submittal.

 

Note:  After completing these steps, you will be able to access NJDEP Online at any time by visiting http://www.njdeponline.com and clicking “Continue” at the top right of the screen.

 

NJDEP Online Instructions for the P2 Plan Summary:  after you have logged onto

the myNewJersey Portal with your Authorization Code

 

Under the five tabs you will see:

“Version x.x

  Currently Logged in: Your Name (your User ID)”

 

You can find the instructions for the P2 Plan Summary under the Documents and Forms tab.

 

Part 2.

 

STEP 1: TO ADD YOUR FACILITY

1.          Under the “My Workspace” tab, scroll down to My Facilities/Program Interests section and click on the “Add Facilities” button on the right-hand side.

2.          A Facility Search screen will appear; fill in information for CRTK Facility ID or Facility Name.  Click “Search” button at bottom right of page.

3.          Facility Search Results page will appear.  Check the box for the facility(s) you would like to access and click the “Add Selected Facilities” button.

4.          Add Facility(s) – you may have multiple facilities under your account.

 

STEP 2: TO ADD YOUR SERVICES

1.         Under the “My Workspace” tab, scroll down to Service Selection and click on the “Configure Services” button on the right-hand side.

2.         Check boxes for desired services and click the “OK” button.

 

STEP 3: TO ACCESS YOUR FACILITY AND COMPLETE THE RPPR

1.          Under Right to Know and Pollution Prevention Program in the Service Selection section, click on “Release and Pollution Prevention Report and Pollution Prevention Plan Summary.

2.          The Facility Selection screen will appear; highlight the facility of interest and click on the “Access Facility” button under the selection list.

3.         This will bring you to the RPPR and P2 Plan Summary Folder for the facility of interest.

4.         Click on the “Create New Report” button, enter the reporting year, and select the radio button for the Release and Pollution Prevention Report.

5.         In the RPPR and P2 Plan Summary Folder, click on the link for the new Release and Pollution Prevention Report and you are on your way to preparing the RPPR.

 

When you have completed the RPPR, the Status will be “Awaiting Certification.”  You will need a certification PIN in order to certify and submit your RPPR.  If you did not request one at registration, from the RPPR & P2 Plan Summary Folder go to the dropdown list (found in the upper left of the Folder screen) under “Identification” and select “Edit User Profile.”  At the DEPOnline Services screen, be sure you are at the User Profile tab and click on the “Request Cert Pin” link.  In a matter of minutes you should receive a certification PIN by email from PortalComments@dep.state.nj.us.  Go back to your Folder by clicking on the “My Workspace” tab, click on “Release and Pollution Prevention Report and Pollution Prevention Plan Summary” and access your facility’s Folder.  Click on the “Certification and Submittal” button and check the appropriate certification box(es) and certify with appropriate information.  A complete submission will result in a screen with the following message: “The Report certification was successful.”  Print two (2) copies of the RPPR; one for the facility and one to be sent to your County Right to Know Lead Agency.  DO NOT mail a copy to the DEP.

 

Part 3. The facility must first complete the Release and Pollution Prevention Report (RPPR) online. (In the “RPPR and P2 Plan Summary Folder” the status must be “Awaiting Certification” or “Submitted.”)

 

STEP 1: TO ACCESS YOUR FACILITY AND COMPLETE THE P2 PLAN SUMMARY

 

1.         In the “RPPR and P2 Plan Summary Folder”, click on the “Create New Report” button, enter the reporting year, and select the radio button for the “Pollution Prevention  Plan Summary(DEP113 From)” and click the “Continue” button.

2.         Complete the P2 Plan Summary; then certify and submit it to the DEP online!

 

When you have completed the P2 Plan Summary, the Status will be “Awaiting Certification.”  Use same certification PIN to certify and submit your P2 Plan Summary.

 

 

REMEMBER to print and sign a copy for your records and keep it at your site.  For additional information or assistance in completing the eRPPR/ P2 Plan Summary, please call (609) 777-0518 during business hours (8:00 a.m. – 5:00 p.m.)


NEW JERSEY POLLUTION PREVENTION PLAN SUMMARY

FOR POLLUTION PREVENTION PLANS COVERING THE FIVE YEAR

 (Form DEP-113)

 

TABLE OF CONTENTS 

 

I.  GENERAL INFORMATION  

WHAT FACILITIES ARE COVERED?  ...............................……....….................1

WHAT ARE COVERED FACILITIES REQUIRED TO DO?  ....….........…...…............1

WHAT HAZARDOUS SUBSTANCES ARE COVERED?..............…...…...............2

WHAT INFORMATION IS CONTAINED IN THE P2 PLAN SUMMARY?    ...........2

II. SECTION-SPECIFIC INSTRUCTIONS  

 

 SECTION A.   GENERAL FACILITY INFORMATION  ...........…......………............. 2

 

SECTION B.   FACILITY-LEVEL INFORMATION.....................….......………............4

SECTION C.   PROCESS DESCRIPTION ...............................….......…………...........  5

SECTION D.   TARGETED PROCESS INFORMATION  .....………..................... 6

 

III. HOW TO SUBMIT THE P2 PLAN SUMMARY    ...................….................…  7

 

APPENDIX 1   POLLUTION PREVENTION METHODS  ..................……....  9

 

APPENDIX 2   PROCESS TECHNIQUES        ...............….................…..........10

 

APPENDIX 3   WASTE TREATMENT METHODS ............….................…..........12


 

 

INSTRUCTIONS FOR THE

NJDEP POLLUTION PREVENTION PLAN SUMMARY

FOR POLLUTION PREVENTION PLANS COVERING THE FIVE YEAR

 (Form DEP-113)

 

 

 

FOR QUESTIONS REGARDING THE P2 PLAN SUMMARY,

CALL THE NJDEP OFFICE OF POLLUTION PREVENTION & RIGHT TO KNOW AT:

(609) 777-0518

--------------------------------------------------------------------------------------------------------------------------------

WHAT FACILITIES ARE COVERED?

 

Any industrial facility in New Jersey required to submit at least one Toxic Release Inventory (TRI) report to the United States Environmental Protection Agency (USEPA) under Section 313 of the federal Emergency Planning and Community Right to Know Act of 1986 (EPCRA) and a Release and Pollution Prevention Report (RPPR) under the New Jersey Worker and Community Right to Know Act for the same chemical in two consecutive years is covered under the New Jersey Pollution Prevention Act and regulations as long as the reported chemical remains at or above TRI activity thresholds.

 

Covered facilities must prepare a five-year Pollution Prevention (P2) Plan and submit a P2 Plan Summary  by July 1 once they become covered (the second  year they submit an RPPR for the same chemical).. The full P2 Plan is not required to be submitted to the New Jersey Department of Environmental Protection (NJDEP).  The P2 Plan remains on site at the facility and is subject to inspection by NJDEP.  In the years following the preparation of the Plan and Plan Summary, an RPPR containing a P2 Progress Report (the P2 115 or Sections C and D) must be submitted by July 1.

 

NOTE:  If the facility is not required to submit a TRI report, but has submitted a TRI report or an RPPR in the past, NJDEP should be notified of the facility’s present status.  It is mandatory for the facility to provide to the Department at the address below a statement explaining why the facility is no longer covered by the TRI reporting requirements.

 

MAIL CODE 22-03C

New Jersey Department of Environmental Protection

Division of Environmental Safety and Health

Office of Pollution Prevention and Right To Know

PO Box 420

Trenton, NJ 08625-0420

 

 

WHAT ARE COVERED FACILITIES REQUIRED TO DO?

 

Facilities covered under the New Jersey Pollution Prevention Act are required to prepare three documents in accordance with N.J.A.C.7:1K et seq.  The first is a comprehensive P2 Plan that remains onsite at the facility. The second requirement is completion and electronic submission of the P2 Plan Summary (DEP-113).  The P2 Plan Summary is, as its name indicates, a summary of the facility’s P2 Plan.  Both the P2 Plan Summary and the full P2 Plan must be completely revised every five years.

 

In addition to the five-year P2 Plan Summary, beginning with the year following the completion of the P2 Plan and Plan Summary, the third document that facilities are required to prepare is an annual P2 Progress Report. This requirement is satisfied by the annual submission of the RPPR, which includes the P2 Progress Report.

 

PLEASE NOTE THAT THE DEPARTMENT PERFORMS ROUTINE INSPECTIONS TO VERIFY THAT COMPLETE AND ACCURATE P2 PLANS ARE BEING MAINTAINED ON SITE.  IN ADDITION TO THE P2 PLAN, THE P2 PLAN SUMMARY IS A SEPARATE DOCUMENT THAT MUST BE SUBMITTED ELECTRONICALLY TO THE NJDEP.

 

WHAT HAZARDOUS SUBSTANCES ARE COVERED?

 

The list of hazardous substances reportable on the P2 Plan Summary is the same list as the Section 313 Toxic Chemical List that applies to the federal TRI.  For electronic reporting, the system automatically limits the substances to those reported on the RPPR. If the facility manufactured, processed and/or otherwise used any of these hazardous substances in quantities of 10,000 pounds or more (with all applicable exemptions) during the base year, or above listed threshold quantities for persistent bioaccumulative toxic (PBT) chemicals, the facility must include them in the P2  Plan and on the P2 Plan Summary.  The substance list can also be found at http://www.state.nj.us/dep/opppc/figdoc.htm

 

Pursuant to N.J.A.C. 7:1K-3.1(h), if the sum of nonproduct output and quantity shipped as (or in)  product for that hazardous substance does not exceed 500 pounds, determined from the value reported in Section B of the most current RPPR, the substance shall be exempt from P2 Planning requirements.  The substance does not need to be included in the P2 Plan.  In addition, that substance does not need to be reported on the P2 Plan Summary or the subsequent annual Progress Reports, RPPR, section C and D or P2-115.

 

WHAT INFORMATION IS CONTAINED IN THE P2 PLAN SUMMARY?

 

The P2 Plan Summary is based on information contained in the facility’s P2 Plan. Completing the P2 Plan Summary entails transferring information directly from the P2 Plan to the P2 Plan Summary.  There are four sections to the P2 Plan Summary:

 

            Section A asks for general facility information. 

 

            Section B asks for information on the facility’s five-year reduction goals for each covered hazardous substance at the facility. 

 

            Section C asks for information on each production process that uses covered hazardous substances or generates hazardous substances as nonproduct output (NPO).  Complete one section for EACH covered production process or grouped process.

 

            Section D asks for information on the facility’s five-year reduction goals for those processes or grouped processes identified in Section C that are targeted in the P2 Plan.  Complete one Section D for EACH targeted process or targeted grouped process.

 

SECTION A.  FACILITY-LEVEL ADMINISTRATIVE INFORMATION

 

New, Modification and Renewal Boxes: If this P2 Plan Summary is the first one ever to be submitted to the Department, check the “New” box.  If this P2 Plan Summary reflects a modification to the facility’s P2 Plan during a five-year cycle, check the “Modification” box.  If this P2 Plan Summary is to be submitted for a subsequent five-year planning cycle, check the “Renewal” box. See “Frequently Asked Questions” on the Web at http://www.nj.gov/dep/opppc/faq.pdf to determine if modification is necessary.

1.         Telephone and FAX Numbers: Enter the facility’s telephone number and FAX number without punctuation.

 

2.         Highest Ranking Corporate Official at Facility: Enter the name and the position or title of the highest-ranking corporate official at this facility.

 

3.         R&D and Pilot Plant Exemption: If this facility has an approved NJ RTK Research & Development (R&D)Laboratory exemption pursuant to N.J.A.C. 7:1G, it will be pre-populated here.  If an exemption applies but the number does not show up here, call the Office at (609) 777-0518.

 

4.a.      Total Number of Processes: Enter the total number of processes that involve hazardous substances at the facility.  These processes are the ones identified in the facility’s P2 Plan.  This number must equal the number of Section Cs in this P2 Plan Summary.

 

4.b.      Number of Targeted Processes: Facilities may target a subset of their total production processes. Facilities that do not target a subset of processes must target all of their processes.  One Section D is required for each targeted process.  The criterion that a facility must use for targeting is that the number of targeted processes must equal at least 90% of the total amount of hazardous substances used or generated as nonproduct output or released at the facility.  Enter the number of processes or grouped processes that the facility has targeted. Be aware that all processes with PBTs above the reporting threshold(s) must be targeted.

 

4.c.      Basis for Targeting: Enter the code “U,” “N,” “R,” or “A” to indicate whether the facility chooses to target production processes that equal at least 90% of the total USE (U), generation of nonproduct output (N) or total environmental releases (R) of all hazardous substances at the facility.  If a facility chooses to target all production processes, select (A) in the box.

 

5.                  Confidential Information: Select “Yes” if the P2 Plan Summary contains information that the facility claims is confidential and “No” if it is not.  If the facility selects “Yes,” the facility should continue completing and submitting the P2 Plan Summary online by leaving the confidential information blank on the rest of the forms. This will become a public version of P2 Plan Summary of the facility. 

 

            After submitting the public version online, the facility should print out a copy of the P2 Plan Summary and complete all the confidential information with RED ink. Pursuant to the N.J.A.C. 7:1K-1 et seq., the facility  should follow the following steps in order to complete the confidential submittal: 1) every page of the confidential version should be clearly marked "CONFIDENTIAL" except for the first page which should be marked "CONFIDENTIAL COPY"; and 2) the confidential version should be placed in a sealed envelope marked "CONFIDENTIAL" on both sides with facility name and ID number marked as well, enclosed in a second envelope for mailing which shall bear no markings indicating confidentiality, and submitted to NJDEP, Office of Pollution Prevention and Right to Know, Station Plaza 4, 22 S. Clinton Avenue-3rd Floor, P.O. Box 443, Trenton, NJ 08625-0443

 

6.                  Union Representative at Facility (if applicable): Enter the name of the union representative,  Union and Local #,  and business phone number at this facility

 

 

 

 

 

SECTION B.  FACILITY-LEVEL INFORMATION

 

Complete Section B data for each covered hazardous substance at the facility. These substances must be the same as those reported on the RPPR.

 

1. & 2. CAS number or Category number and Hazardous Substance:  Click the “Add Substance” button and select all the substances listed. The covered substance name and CAS number will be automatically populated.

 

3          Five-Year Facility-Level NPO and USE Reduction Goals:  To complete this section, refer to the facility’s P2 Plan, which must include a section on the facility's goals for reducing USE and Nonproduct Output (NPO). The facility’s P2 Plan should have produced reduction goals for both the USE and NPO of hazardous substances due to pollution prevention techniques.  Record the facility-level goals here for each hazardous substance.

 

3.a.      Five-Year Use Reduction Goal (pounds): Enter the five-year USE reduction goal in pounds for this substance from the facility’s P2 Plan.  This should be the difference in pounds in the amount of the substance the facility used in the base year and the amount the facility expects to use at the end of the planning cycle (the fifth year).  State the facility’s reduction goal assuming constant production, that is, assuming that the facility will be producing the same quantity of product in five years as was produced in the base year.  These goals should reflect planned reductions due to pollution prevention measures only.  The goals should not include reductions resulting from discontinued operations or operations sent to another facility, as these measures do not qualify as pollution prevention under the statutory definition.  The facility may have zero reduction goals.

 

3.b.      Five-Year NPO Reduction Goal (pounds): Enter the five-year NPO reduction goal in pounds for this substance from the facility’s P2 Plan.  This should be the difference in pounds between the amount of the substance the facility generated as NPO in the base year and the amount of NPO the facility expects to generate at the end of the planning cycle (the fifth year).  State the facility’s reduction goal assuming constant production, that is, assuming that the facility will be producing the same quantity of product in five years as was produced in the base year.  These goals should reflect planned reductions due to pollution prevention measures only.  The goals should not include reductions resulting from discontinued operations or operations sent to another facility, as these measures do not qualify as pollution prevention under the statutory definition.  The facility may have zero reduction goals.

 

 3.c.     Five-Year Use Reduction Goal (percent): Enter the percentage of the base year USE that the facility plans to cut by the goal year.  Find the five-year USE reduction percent goal by doing the following calculation:

 

Five-year USE reduction goal (pounds) x 100 = Five-Year USE % Reduction Goal

                      Base year USE (pounds)

 

3.d.      Five Year NPO Reduction Goal (percent): Enter the percentage of the base year NPO that the facility plans to cut by the goal year.  Find the five year NPO reduction percent goal by doing the following calculation:

 

Five year NPO reduction goal (pounds) x 100 = Five Year NPO % Reduction Goal

                        Base Year NPO (pounds)

 

SECTION C.  PROCESS DESCRIPTION

 

Complete one Section C for each process or grouped process that USES, generates as NPO, or RELEASES a covered hazardous substance.  The number of these sections the facility submits must equal the number the facility entered in Question 4.a. of Section A.

 

At the “Sections C & D: Pollution Prevention Processes Folder

 

Process ID: Enter the identifier, defined in the facility’s P2 Plan, to be used to refer to the process described in this Section throughout the facility’s P2 reporting.  The same identifier must be used in the facility’s P2 Plan, P2 Plan Summary, and RPPR.  The identifier must be unique, applying to only one process (or grouped process).  The identifier may be up to 12 characters long and may consist of letters, numerals, or both. Do not use punctuation or spaces in your process ID.

 

Targeted Processes: Indicate "Yes" if this process was targeted in the facility’s Pollution Prevention Plan, otherwise indicate "No.”  Remember that a facility must target any combination of processes or sources that contribute to at least 90% of the facility’s USE, NPO or releases and must include all processes with PBTs. Otherwise, all processes must be targeted.

 

1.         Process ID: This element is pre-populated, if this is your “Renewal” or “Modification”. Otherwise, enter the identifier, defined by the facility in their P2 Plan, to be used to refer to the process described in this Section throughout the facility’s pollution prevention reporting. The same identifier must be used in the facility’s P2 Plan, P2 Plan Summary, and P2 Progress Report (RPPR Section D or P2-115). The identifier must be unique, applying to only one process (or grouped process). The identifier may be up to 12 characters long and may consist of letters, numerals, or both. Do not use punctuation or spaces in your Process ID.

 

2.a.      Process Category: Indicate whether this process or grouped process (1) manufactures a chemical, (2) manufactures an article, (3) stores and/or handles hazardous substances, or (4) treats and/or recycles (out-of-process) NPO.  Complete the box for the category that best fits the process or grouped process.  The storage and handling process category should be chosen when the process or grouped process is solely storage and handling.  Descriptions of these categories are as follows.

 

Article manufacturing usually produces discrete items with an identity that is not encompassed by a specific chemical name.  Chemicals used in article manufacturing are seldom consumed; they may be mixed and combined into an article, or used in some way in the production of the article, such as in a solvent cleaner or degreasing step.

 

Chemical manufacturing usually combines chemical ingredients to produce a chemical product. If this process consumes (molecularly alters) a chemical, then it is almost always a chemical manufacturing process.

 

Storage and Handling processes generally involve storing raw materials prior to use, storing materials recycled on-site prior to use, storing wastes prior to disposal, storing final product or handling hazardous substances through transfers from one area of the facility to another.  If there is a storage and handling component of the process, choose the category that fits the parent process rather than "storage and handling."

 

Treatment Operations involve the treatment or recycling of hazardous substances that leave a process as NPO.  These operations must be identified when they use hazardous substances as part of the treatment or recycling process. Treatment and recycling processes may not be grouped together with or as part of other processes.

 

2.b.      Mode of Operation:  Indicate one mode of operation that best describes how this process is run, either batch or continuous.  For Treatment/Recycling and Storage/Handling processes, select “Not Applicable.”

 

Descriptions of the two modes of operation follow:

 

A batch process will have an identifiable beginning and end over a relatively short time frame.  It will entail inputting a set amount of raw materials at the beginning and perhaps during the process to produce a set amount of product at the end.  Examples include the formulation of a set quantity of a certain color pigment or a run of a particular pattern of wall covering.

 

A continuous process involves a continuous flow of raw material inputs to produce a continuous flow of outputs.  An example is the production of gasoline and other fuels from crude oil.

 

2.c.      Specific Descriptions: For each step in the process or grouped process, select the code corresponding to the most applicable descriptor. (See Appendix 2.)  For instance, a process that makes adhesive tape might involve three steps: mixing an adhesive resin with a solvent, applying this mixture to paper backing, and driving the solvent from the tape with a dryer.  The appropriate process descriptors would be UC1, "Mixing"; AA6, "Coating -- adhesive application"; and UA9, "Drying."

 

The descriptor list includes "similar to" and "other" categories.  Use these only if another descriptor is inadequate to identify the process step.  Augment the facility’s description if necessary in the space provided, that generically describes the step, perhaps by indicating a term not found on the list that would suffice.  Select a descriptor for each discrete step until the entire process is described.

 

2.d.      Hazardous substances used or generated by this process: Select each covered hazardous substance used or generated by this process. 

 

3.                  Targeted Processes: This element is pre-populated, if this is your “Renewal” or “Modification”. Otherwise, indicate “Y” for “Yes” if this process was targeted in the facility’s P2 Plan, or indicate “N” for “No.” Remember that a facility must target any combination of processes or sources that contribute to at least 90% of the facility’s USE, NPO or Releases and must include all PBTs. If not, all processes must be targeted.

 

4.                  Grouped Processes: In the P2 Plan, the facility could have associated several processes together into a single grouped process that would be treated as a single process for the purposes of pollution prevention planning.  Select "Yes" if this process is a grouped process; otherwise select "No."

 

SECTION D.  TARGETED PROCESS INFORMATION

 

Complete one of these sections for each targeted production process the facility has identified in the P2 Plan.  This section summarizes 5-year USE and NPO reduction goals for each hazardous substance used in the process.  Instructions for specific questions follow.  The number of these sections that the facility submits must equal the number the facility entered in Question 4.b. of Section A.

 

1.         Five-Year Reduction Goals for Hazardous Substances used in Process or Grouped Process

 

            Use Range: After identifying each hazardous substance, select the USE range of the hazardous substance in this targeted process (0-4,999 lbs.; 5,000-9,999 lbs.; 10,000-24,999 lbs.; 25,000 - 49,999 lbs.; 50,000 lbs. or more).  Remember: USE = quantity consumed + quantity shipped as (or in) product + NPO.

 

            Five-Year Reduction Goal per Unit of Product Percent:  Enter the process-level reduction per unit of product goals for each hazardous substance used or generated as NPO by this targeted process, as a percentage reduction from the base year.  Include reduction goals for both USE per unit of product and NPO per unit of product.

 

EXAMPLE: A process that produces metal tools presently generates 100 pounds of solvent as NPO per 1000 items.  The facility’s P2 Plan goal for this process is 10 pounds NPO per 1000 items; therefore the facility’s NPO per unit of product goal is to move from 100/1000 (0.1) to 10/1000 (0.01).  The reduction sought is a reduction from 100 pounds to 10 pounds per 1000 items, hence [(100-10)/100]*100=90%.  This is an NPO reduction goal of 90%.

 

            Estimated Date of Introduction and Completion: For each technique or group of techniques associated with a specific hazardous substance, enter the estimated date when work on any of the techniques will begin and the estimated date when any of the techniques will be completed. This summarizes the facility’s implementation schedule.  If a technique was begun prior to the base year and implementation continues, state the date when the technique was begun.

 

Description of Pollution Prevention Techniques: For each substance, select the code(s) that describes the pollution prevention technique(s) the facility plans to use to reduce USE or the generation of NPO over the next five years. (See Appendix 1.)  If none of the codes adequately describes the pollution prevention technique(s) the facility has chosen, enter the description in the box.

 

2. (Optional) Raw Material Substitution Certification:  (Complete only if the facility wants to establish that raw material substitution is not feasible.)  There are many pollution prevention techniques; raw material substitution is only one of them.  The Pollution Prevention Act recognizes that there are situations in which a specific hazardous substance is the only raw material that will produce a desired product.  Therefore, facilities may publicly establish, through a raw material substitution certification, that there is no way to reduce the USE and/or NPO of a specific substance in a specific process through substitution of a non-hazardous substance. This does not, however, excuse the facility from looking for pollution prevention opportunities that do not involve raw material substitution. Facilities self-certify their own raw material substitution certification on the basis of a completed P2 Plan.

 

To self-certify the raw material substitution certification in the P2 Plan Summary, a facility must:

 

2.a. Identify the hazardous substance(s) for which the certification is being made.  Enter the name of one or more hazardous substances (from Question 1 of this section).

2.b.  Explain why raw material substitution cannot be accomplished for the hazardous substance(s).  Enter a brief narrative explanation.  For instance, "This process makes PVC pipe.  The hazardous substance vinyl chloride is an essential component of PVC."

 

III.             How to submit the P2 Plan Summary

 

DEP regulations now require electronic submission of the P2 Plan Summary. For electronic certification and submittal, the person who is the responsible party must have his/her own User Profile set up (see page I), with his/her own name under User Name. This will be the name that prints out for the certification. The certifier should select a PIN that is easy to remember, but that is known only to him or her.

 

When the P2 Plan Summary has been completed and is ready for certification and submittal, the certifying official must access the facility report by logging in with his/her own User ID and PIN, selecting the “Release and Pollution Prevention Report and Pollution Prevention Plan Summary” radio button, clicking the “Continue” button, and clicking the “Access Facility” button.

 

Once the facility report screen has been accessed, the certifying official will see that the Report Status is “Awaiting Certification.” (If the Status is NOT “Awaiting Certification,” contact the Office at the phone number below for assistance.) Click the “Certification and Submittal” button to get to the certification folder and select the report to be certified and click “Continue.”

 

Check the appropriate boxes for the certifying statements, enter the PIN and Title of the certifier. (Note: the name of the certifying party will show up on this screen as the User ID, but will show up on the certification signature as the User Name.) Click on the “Certify” button and a screen will appear stating that “The Report certification was successful.” Click “Continue” to get to the RPPR and P2 Plan Summary Folder. The Status will now be “Submitted.”

 

Use the printer icon to the left of the Report to format the report for printing.

 

In the case of a confidential paper submission, (see page 3 for details), it is required to return the completed original P2 Plan Summary to the DEP at the address below.

 

MAIL CODE 22-03C

New Jersey Department of Environmental Protection

Division of Environmental Safety and Health

Office of Pollution Prevention and Right To Know

PO Box 420

Trenton, NJ 08625-0420

 

For additional assistance or any questions about completing the P2 Plan Summary, contact the DEP's Office of Pollution Prevention and Right to Know at (609) 777-0518.


Appendix 1

 

POLLUTION PREVENTION METHODS

(Adapted from EPA TRI Instructions)

Use for Section D, question 1.

 


Good Operating Practices

 

  W13       Improved maintenance scheduling, record keeping, or procedures

  W14       Changed production schedule to minimize equipment and feedstock changeovers

  W19       Other changes in operating practices

 

 

Inventory Control

 

  W21       Instituted procedures to ensure that materials do not stay in inventory beyond shelf life

  W22       Began to test outdated material - continue to use if still effective

  W23       Eliminated shelf-life requirements for stable materials

  W24       Instituted better labeling procedures

  W25       Instituted clearinghouse to exchange materials that would otherwise be discarded

  W29       Other changes in inventory control

 

 

Spill and Leak Prevention

 

  W31       Improved storage or stacking procedures

  W32       Improved procedures for loading, unloading, and transfer operations

  W33       Installed overflow alarms or automatic shutoff valves

  W35       Installed vapor recovery systems

  W36       Implemented inspection or monitoring program of potential spill or leak sources

  W39       Other spill and leak prevention

 

 

Raw Material Modifications

 

  W41       Increased purity of raw materials

  W42       Substituted raw materials not on the TRI list

  W49       Other raw material modifications

 

 

Process Modifications

 

  W51       Instituted recirculation within a process

  W52       Modified equipment, layout, or piping

  W53       Use of a different process catalyst

  W54       Instituted better controls on operating bulk containers to minimize discarding of empty containers

  W55       Changed from small volume containers to bulk containers to minimize discarding of empty containers

  W58       Other process modifications

 

Cleaning and Degreasing

 

  W59     Modified stripping/cleaning equipment

  W60     Changed to mechanical stripping/cleaning devices (from solvents or other materials)

  W61     Changed to aqueous cleaners (from solvents or other materials)

  W63     Modified containment procedures for cleaning units

  W64     Improved drainage procedures

  W65     Redesigned parts racks to reduce dragout

  W66     Modified or installed rinse systems

  W67     Improved rinse equipment design

  W68     Improved rinse equipment operation

  W71     Other cleaning and degreasing modifications

 

 

Surface Preparation and Finishing

 

  W72     Modified spray systems or equipment

  W73     Substituted coating materials used

  W74     Improved application techniques

  W75     Changed from spray to other system

  W78     Other surface preparation and finishing modifications

 

 

Product Modifications

 

  W81     Changed product specifications

  W82     Modified design or composition

  W83     Modified packaging

  W89     Other product modifications

 

 

On-Site Recycling Processes

 

NOTE: On-Site Recycling is considered pollution prevention ONLY IF IN-PROCESS (See N.J.A.C. 7:1K-1.5).

 

  R11      Solvents/organic recovery - batch still distillation

  R12      Solvents/organic recovery - thin-film evaporation

  R13      Solvents/organic recovery - fractionation

  R14      Solvents/organic recovery - solvent extraction

  R19      Solvents/organic recovery - other

  R21      Metals recovery - electrolytic

  R22      Metals recovery - ion exchange

  R23      Metals recovery - acid leaching

  R24      Metals recovery - reverse osmosis

  R26      Metals recovery - solvent extraction

  R27      Metals recovery - high temperature

  R28      Metals recovery - retorting

  R29      Metals recovery - secondary smelting

  R30      Metals recovery - other

  R40      Acid regeneration

  R99        Other reuse or recovery


Appendix 2

 

PROCESS TECHNIQUES

(Use for Section C, question 3.c.)

 


A List:     Most Applicable to Article

Manufacturing Processes

 

AA1         Bleaching

AA2         Cleaning - of metal

AA3         Cleaning - paint stripping

AA4         Cleaning - of equipment

AA5         Cleaning - other

AA6         Coating - adhesive application

AA7         Coating - paint application

AA8         Coating - other

AA9         Degreasing

AB1         Dyeing

AB2         Electroless plating

AB3         Electroplating

AB4         Etching

AB5         Metal casting/machining

AB6         Metal treatment (other than plating)

AB7         Painting

AB8         Paper manufacturing/treatment

AB9         Photographic film manufacturing or processing

AC1         Plastics molding/casting/extrusion

AC2         Printing

AC3         Soldering/welding

AC4         Stripping

AC5         Tanning

AC6         Wood pulping/treatment

AC7         Similar to

AC8         Other article manufacturing

 

 

C List:      Most Applicable to Chemical Manufacturing

 

CP1         Purification

CP2         Separation

CP3         Formulation/blending

CP4         Chemical synthesis

CP5         Chemical breakdown

CP6         Chemical conversion

CP7         Similar to

CP8         Other chemical manufacturing

 

 

H List:     Most Applicable to Storage and Handling

 

HA1         Above ground tank

HA2         Below ground tank (steel)

HA3         Below ground tank (fiberglass)

HA4         Tank inside building

HA5         Steel drum

HA6         Plastic drum

HA7         Fiber drum

HA8         Can

HA9         Carboy

HB1         Silo

HB2         Bag

HB3         Box

HB4         Cylinder

HB5         Bottles or jugs (glass)

HB6         Bottles or jugs (plastic)

HB7         Tote bin

HB8         Tank wagon

HB9         Rail car

HC1         Other storage and handling

 

 

T List:     Use to Supply Additional Information

                if Necessary on Chemical Reactions

 

TA1         No reaction

TA2         Acylation

TA3         Alkylation

TA4         Amination

TA5         Ammonolysis

TA6         Aromatization

TA7         Calcination

TA8         Carboxylation

TA9         Combustion

TB1         Condensation

TB2         Dehydration

TB3         Dehydrogenation

TB4         Desulfurization

TB5         Diazotination and coupling

TB6         Double decomposition

TB7         Electrolysis

TB8         Esterification

TB9         Fermentation

TC1         Friedel-Crafts

TC2         Halogenation

TC3         Hydroformylation

TC4         Hydrogenation

TC5         Hydrolysis

TC6         Ion exchange

TC7         Isomerization

TC8         Neutralization

TC9         Nitration

TD1         Oxidation

TD2         Polymerization

TD3         Pyrolysis/cracking

TD4         Reduction

TD5         Silicate formation

TD6         Sulfonation

TD7         Other reaction

 

 

U List:     Most Applicable for Describing Unit

Operations for Any Process Category

 

UA1         Absorption/adsorption

UA2         Centrifugation

UA3         Cleaning/degreasing

UA4         Condensation

UA5         Crystalization

UA6         Desalting

UA7         Disintegration

UA8         Distillation

UA9         Drying

UB1         Dust collection

UB2         Evaporation

UB3         Fermentation

UB4         Filtration

UB5         Grinding/milling

UB6         Heat exchange

UB7         Humidification

UB8         Ion exchange

UB9         Melting

UC1         Mixing

UC2         Packaging

UC3         Pressurizing

UC4         Reaction

UC5         Screening

UC6         Scrubbing

UC7         Sedimentation

UC8         Separation

UC9         Settling

UD1         Soaking/wetting

UD2         Solvent extraction

UD3         Spraying/coating

UD4         Stripping

UD5         Other unit operation

 

 

E List:      Use to Supply Additional Information Regarding Equipment for Any Process Category

 

EA1         Absorption bed

EA2         Aerator

EA3         Blower

EA4         Boiler

EA5         Centrifuge

EA6         Compressor

EA7         Condenser

EA8         Cooler

EA9         Crystalizer

EB1         Digester

EB2         Distillation Column

EB3         Dryer

EB4         Evaporator

EB5         Scrubber/stripper/extraction tower

EB6         Extruder

EB7         Filter

EB8         Flash drum

EB9         Fractioning tower

EC1         Furnace

EC2         Heat exchanger

EC3         Holding tank

EC4         Mill/grinder

EC5         Mixer

EC6         Reactor vessel

EC7         Refrigeration unit

EC8         Rinse tank

EC9         Separator

ED1         Settling tank

ED2         Other equipment

 

 

 

 

P List:      Use to Supply Additional Information Regarding Phase Form for Any Process Category

 

PA1         Gas

PA2         Liquid (coherent)

PA3         Solid

PA4         Aqueous solution

PA5         Organic solution

PA6         Slurry

PA7         Sludge

PA8         Emulsion

PA9         Powder fines

PB1         Aqueous acid

PB2         Aqueous base

PB3         Metal product

PB4         Polymer mixer

PB5         Crude petroleum

PB6         Refined fuel/mixed hydrocarbon

PB7         Unrefined ore/minerals

PB8         Clay/cement

PB9         Animal byproducts

PC1         Vegetable byproducts

PC2         Wood chips/pulp/byproducts

PC3         Other phase form

 

 

 

Text Box: Appendix 3

WASTE TREATMENT METHODS

(Use  for Section C, question 3.c., ONLY IF Treatment Operations is selected for question 3.a.)

 

 

 

 

 

 

 


Air Emissions Treatment

 

A01         Flare

A02         Condenser

A03         Scrubber

A04         Absorber

A05         Electrostatic Precipitator

A06         Mechanical Separation

A07         Other Air Emission Treatment

 

Biological Treatment

 

B11          Biological Treatment - aerobic

B21          Biological Treatment - anaerobic

B31          Biological Treatment - facultative

B99          Biological Treatment - other

 

Chemical Treatment

 

C01          Chemical Precipitation - lime or sodium

                hydroxide

C02          Chemical Precipitation - sulfide

C09          Chemical Precipitation - other

C11          Neutralization

C21          Chromium Reduction

C31          Complexed Metals Treatment (other than pH adjustment)

C41          Cyanide Oxidation - alkaline chlorination

C42          Cyanide Oxidation - Electrochemical

C43          Cyanide Oxidation - other

C44          General Oxidation (including disinfection) - chlorination

C45          General Oxidation (including disinfection) - ozonation

C46          General Oxidation (including disinfection) - other

C99          Other Chemical Treatment

 

 

Incineration/Thermal Treatment

 

F01          Liquid Injection

F11          Rotary Kiln with Liquid Injection Unit

F19          Other Rotary Kiln

F31          Two Stage

F41          Fixed Hearth

F42          Multiple Hearth

F51          Fluidized Bed

F61          Infra-Red

F71          Fume/Vapor

F81          Pyrolytic Destructor

F82          Wet Air Oxidation

F83          Thermal Drying/Dewatering

F99          Other Incineration/Thermal Treatment

 

Physical Treatment

 

P01          Equalization

P09          Other Blending

P11          Settling/Clarification

P12          Filtration

P13          Sludge Dewatering (non-thermal)

 

 

 

 

 

 

P14          Air Flotation

P15          Oil Skimming

P16          Emulsion Breaking - thermal

P17          Emulsion Breaking - chemical

P18          Emulsion Breaking - other

P19          Other Liquid Phase Separation

P22          Adsorption - ion exchange (other than

                for recovery/reuse)

P23          Adsorption - resin

P29          Adsorption - other

P31          Reverse Osmosis (other than for recovery/reuse)

P41          Stripping - air

P42          Stripping - steam

P49          Stripping – other

P51          Acid Leaching (other than for recovery/reuse)

P61          Solvent Extraction (other than recovery/reuse)

P99          Other Physical Treatment

 

Solidification/Stabilization

 

G01          Cement Processes (including Silicates)

G09          Other Pozzolonic Processes (including Silicates)

G11          Asphaltic Processes

G21          Thermoplastic Techniques

G99          Other Solidification Process